Chama shortens Santa train route to one mile after flood damage
Repairs to a 60-foot washout at milepost 331 force the Cumbres and Toltec Scenic Railroad to alter its holiday schedule.
By Paula Delgado ·

The Santa’s Holiday Express will travel less than a mile this Christmas instead of the usual six-mile round trip. The Cumbres and Toltec Scenic Railroad made the change after heavy rain in Chama last month damaged sections of the historic track.
Marvin Casias, president of the railroad, said the line typically runs from Chama to Dalton and back. That route covers six miles of track. This year, the train will stay in the Chama yard. Casias described the new plan as a short ride where the train will play in the yard.
The route change is necessary because of specific damage to the infrastructure. Casias pointed to a 60-foot washout under a bridge as the primary obstacle. He noted that a second major washout occurred at milepost 331. That second location required a rebuild that the crew could not complete before the holiday season began.
Repairs are slow because the track beds are narrow. Crews cannot use large heavy equipment on the line. Workers must move along the track with smaller tools to fix the washouts. Casias said there is no set timeline for when the full route will reopen.
The event remains open to the public despite the shorter distance. Casias said nearly 800 people attend the train ride every year. The experience still includes Santa Claus, hot chocolate, and a holiday cookie. Riders will board historic rail equipment that is 100 years old.
Casias invited locals to visit the Chama yard for the holiday trains. He noted that the equipment is a century old and that the ride provides a chance to see the historic machinery up close. The railroad will operate the shortened schedule for the remainder of the season.
More News · Albuquerque news · Report a business · Got a Story?






